Case Study · Product Engineering · 10 weeks

Wonderlist

An app the field team would actually open. Offline states in the scope — not a later surprise.

First store release in 10 weeksiOS and AndroidWhatsApp retired
Kitefield · Mobile screenshot

Product Engineering · Mobile

Three jobs that matter on the floor

Project brief

The web tool was fine at a desk.

Useless in a warehouse. A previous vendor delivered screenshots. The team kept using WhatsApp.

Client

Wonderlist

Industry

Operations / Mobile

Timeline

10 weeks

Unit

Product Engineering

The challenge

Screenshots instead of a tool

Warehouse leads ran the operation in a chat thread. The last build never left Figma. Offline was 'later.' Later never came.

The stakes

  • Field team would not open another unused app
  • Offline states were not in the previous scope
  • Store listing and crash reporting were afterthoughts
  • IT would not own a black box

What we scoped

Two stores · three jobs · 10 weeks

  • iOS and Android for the three jobs that matter on the floor
  • Offline states in the signed journeys
  • Store listing, crash reporting, quiet first week
  • Handover so IT is not reverse-engineering a black box
  • Weekly demos with field leads, not a proxy

The solution

Sit with the people who use it. Then write the journeys.

Journeys were written with the field leads, signed, then built. Offline was in the scope — not a later surprise.

The impact

Numbers that moved the needle

10

Weeks to stores

First release. WhatsApp stopped being the product.

Field leads in the weekly demo

3

Jobs that matter

Nothing else until those three worked offline.

Signed before production code

2

Stores

iOS and Android, crash reporting on day one.

Quiet first week, then warranty

First store release in ten weeks. Warehouse leads stopped running the operation in a chat thread.

Timeline

Four phases, ten weeks, one app

01

Week 1–2 · Discover & Define

Field journeys, offline rules, signed scope.

02

Week 3–6 · Build core

The three jobs, on device, with a desk in the warehouse.

03

Week 7–9 · Polish

Stores, crash reporting, handover docs.

04

Week 10 · Launch

Release, quiet first week, 30-day warranty.

Gallery

What we shipped

Floor · The jobs that matter

Floor · The jobs that matter

Stores · First release, quiet first week

Stores · First release, quiet first week

“They sat with the people who use it. That is why it shipped instead of becoming another unused build.”

— R. Sen, COO, Wonderlist